Gurgaon Metro on the wrong track! Poor location making it unviable

The Rapid Metro was constructed by IL&FS Infrastructure in two phases. Low ridership, high cost and poor location is believed to be responsible for the demise of the metro operation

The Rapid Metro was constructed by IL&FS Infrastructure in two phases. Low ridership, high cost and poor location is believed to be responsible for the demise of the metro operation https://ift.tt/32DRNWY September 13, 2019 at 10:16PM

Comments

Popular posts from this blog